Description: Each pack holds six legs in wooden protector with troughs. 4 full packs of No. E 430, 1 partial pack 3 full packs of No. E 430 HB Box says HB and is damaged, see pictures.
Price: 27.95 USD
Location: Avon, Indiana
End Time: 2025-01-29T21:13:45.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
All returns accepted: ReturnsNotAccepted
Lead Diameter: .046 in
Vintage: Yes